|
|
|
|
|
|
 |
 |
 |
 |
 |
 |
|
|
|
|
|

|

|
Projects -
Proposed Schedule
Proposed Construction Projects
Anticipated in Winter 2009
- Nine Mile Road from Whittington to Averhill - Water main
installation
Anticipated in Spring/Summer 2009
- Drake Road from Nine Mile Road to Freedom - Concrete patching
and repair
- Drake Road north of Thirteen Mile Road - Sidewalk installation
(east side)
- Halsted Bridge over I-696 - Michigan Department of
Transportation (MDOT) bridge replacement project
- Halsted Road from Eleven Mile Road to I-696 - Asphalt repair and
resurfacing
- Halsted Road south of Fourteen Mile Road - Repair of the
existing asphalt road section
- Halsted Road south of Valhalla - Sidewalk installation (east
side)
- I-275/I-96/I-696 interchange from Meadowbrook to Halsted - MDOT
resurfacing and repair
- I-696 from Halsted to I-75 - MDOT freeway patching and repair
- I-696 over Drake Road - MDOT bridge deck patching and repair
- I-696 over Inkster Road - MDOT bridge deck patching and repair
- I-696 pedestrian bridge at Harrison High School - MDOT bridge
replacement
- Middlebelt Road from Elton to Sans Souci - Sidewalk installation
(east side)
- Nine Mile Road from Gill to east of Farmington - Concrete
patching and repair
- Orchard Lake Bridge over I-696 - MDOT bridge deck patching and
repair project
- St. Francis Avenue from Eight Mile Road to Independence and
Eight Mile Road from St. Francis Avenue to Inkster - Water main
replacement project
- Thirteen Mile Road from the Detroit Baptist Manor to Middlebelt
- Sidewalk installation (north side)
|
|
|

| |
Site Design/Development by

|
Our website is Section 508 compliant.

|
|
|
|