|
|||||||||||||||||||
|
|
|||||||||||||||||||
|
|||||||||||||||||||
It shall be the applicant’s responsibility to meet the following rezoning sign requirements when applying to rezone property in the City of Farmington Hills. Failure to conform to these requirements may result in delays in the rezoning process. For further information, contact the Planning Office staff at (248) 871-2540. The proponent of a rezoning request will be required to submit a sign location plot plan with the application for rezoning. The sign location plot plan must be reviewed and approved for compliance with location and specification requirements by the Planning Office prior to submission of the rezoning application. The rezoning sign must meet the following specifications:
Sign LocationSigns shall be placed on the property proposed for development and in full public view along street or road frontages. The proposed sign must be located along the property line of the right-of-way at the midpoint of the property width. A corner lot, or a lot situated on more than one road, will require a sign for each road frontage, meeting the above location requirements. In no instance shall a sign be located within 25 ft. of the intersection. The Planning Office must approve the sign location at the time of application. In unique cases due to the configuration of the property, or natural features the Planning Office may approve an alternate sign location. Installation of SignsRezoning signs shall be installed by the applicant, a minimum of fifteen (15) days prior to the Planning Commission Public Hearing. The rezoning request will not be heard at that scheduled Public Hearing if it is not installed prior to that time. City staff will inspect the sign(s) for appropriate wording, location, visibility and timing. Removal of SignsRezoning signs must be removed within:
Failure to remove sign(s) within this period may require removal of the sign(s) by the City and/or prosecution at the owner’s expense. PermitsThe application will serve as the necessary sign permit required by the City. No additional permits will be required for this sign installation.
business development |
government |
community |
services |
departments |
reference desk |
calendar
|
|||||||||||||||||||
|
|
|||||||||||||||||||